Guardrail Installation at a Data Centre Construction site in UAE


Project Background

DC Guardrail 7

Kee Klamp® Guardrail System

Kee Klamp fittings allow you to construct weldless handrails, safety barriers, and guardrail systems that exceed international safety standards, including EN and OSHA regulations.

Kee Klamp

Our Solution

Our Proposal for Kee Klamp Guardrails was well received by the client as

  • We had stock readily available in UAE to execute the job.
  • Modular nature of the guardrail means that installation could be carried out without obstructing the operation on site.
  • Upon completing of the project, the guardrails can be moved and reused at a different location as opposed to fabricated guardrails that needs to be cut off and has no potential for reuse.

Installation Photos